Embankment Netting Case Study

Problem – Due to a landslip, Network Rail required the embankment to be stripped of vegetation, and coir matting to be installed, during emergency night possessions.

Solution – We provided a long reach excavator to remove the vegetation & reshape the embankment. Our abseilers then installed the matting, manoeuvring & securing the matting into position whilst working off ropes.